Case Story
Life-safety integration on a 600-bed hospital build
£12m controls scope on a new-build hospital. Life-safety, BMS and HVAC integrated so alarms reach the right operator with the right context.
View this case story →
Sector
Hospitals where the building is part of the clinical workflow.
Case Story
£12m controls scope on a new-build hospital. Life-safety, BMS and HVAC integrated so alarms reach the right operator with the right context.
View this case story →